Site map+98 21 2201 8011Contact us
About us

Development plan

The company's production capacity reached 2,500 tonnes a year in February 2025 and 3,500 tonnes a year in September 2026, and the plant more than doubled in size in four years; the next projects are petrochemical catalysts and Iran's largest laboratory for catalysts and rare-earth elements.

In September 2023 new production lines for steel-industry catalysts and a nickel nitrate line with an annual capacity of 3,500 tonnes came into operation. In February 2025 the expansion of catalyst production capacity to 2,500 tonnes a year was inaugurated; as reported at that ceremony, over the previous four years the plant had grown from about 6,000 to more than 12,000 square metres and output had risen more than 25-fold, with production of nearly 1,200 tonnes in the Iranian year 1403 (2024–25). Since September 2026 the company's production capacity has been 3,500 tonnes a year.

  • 3,500tonnes a yearProduction capacitySince September 2026
  • 12,000m²plant areaup from about 6,000
  • 25×growth in output over four yearsto February 2025
  • 3,500tonnes a yearnickel nitrate line capacitysince September 2023

Projects under way

In September 2023 ground was broken for the production of thirteen catalysts needed by the petrochemical industry, a calcining and crushing hall, and Iran's largest and best-equipped laboratory for catalysts and rare-earth elements; in December 2023 they were reported under way. In February 2025 another 8,000 square metres were planned for the plant, with the stated aim of raising output to more than 3,000 tonnes a year. The projects are financed by the parent holding, Development of Mines and Metals Investment Co. (Vamaaden).

Capacity and production

  1. August 2026Annual capacity of 3,500 tonnesProduction and capacity
  2. January 2025Annual capacity of 2,500 tonnesProduction and capacity
  3. August 2023Expansion projects come on streamProduction and capacity
  4. June 2021One tonne of DRI catalyst a dayProduction and capacity
The full history
Talk to our engineers about the right catalyst for your unit.